Dubai construction hero

The discipline behind Dubai's skyline.

The Reality Check

What Happens When Project Controls Are Left to Chance

Risk Level: High
30% Budget Bleed

Average Cost Overrun

On Dubai commercial builds where scheduling and baseline controls are absent. Untracked variations compound and directly erode profit margins.

STATUS: BLEEDING
70% BUDGET
+30% OVERRUN
0% (BASELINE) 100% (LIMIT) 130% (ACTUAL)
Locked by PKAS
Risk Level: Severe
70% Rejection Rate

EOT Claims Rejected

Not because delays weren't excusable, but because contemporaneous logs, logic links, and analytical delay records were deficient or missing.

SCORE: 1/4
✓ 01. Excusable Event Identified
✗ 02. Logic Link Schedule Impact
✗ 03. Contemporaneous Site Diaries
✗ 04. Time Impact Analysis (TIA)
Secured by PKAS
Impact: Schedule Break
6–9 Months Lost

Lost to Design Clashes

Lost to engineering conflicts when structural, architectural, and MEP drawings are not pre-coordinated before site works proceed.

STATUS: CLASHED
MEP
STRUC
ARCH
COLLISION POINT @ DAY 45 SCHEDULE DELAY: 6-9 MONTHS
Resolved by PKAS
analytics

These are not outliers. They are the standard result when project management is treated as overhead rather than infrastructure.

PKAS Project Management Services was engineered from the ground up to prevent every one of these project risks, securing schedules and protecting client capital.

Dubai tower structural concrete and steel under construction
Construction engineering drawing on table

Our Foundation

Built for the
problem.
Not the brochure.

PKAS Project Management Services exists for one reason: to bring institutional Tier-1 GCC planning discipline into a boutique consultancy that boutique clients can actually engage.

The practice is operated by Arunachalam Rajappa — a Planning Manager with 27 years 10 months of programme experience across Dubai, Muscat, and Chennai. His career runs through Tier-1 contractors including Carillion Alawi, Shapoorji Pallonji, Sobha Engineering, and Al Tasnim Enterprises — on Royal Opera House Muscat, Sultan Qaboos Grand Mosque, Hyatt Grand Hotels, three MoH hospitals, and Emaar infrastructure corridors.

From International City, Dubai, PKAS operates as a Dubai FZE LLC channelling that institutional depth into boutique engagements — precision Primavera P6 planning, forensic delay analysis with TIA / Windows / As-Built / Baseline Impact methodologies, and certified QS supply.

27+
Years Programme
UAE · OM
GCC Lineage
FZE
Dubai Licensed

What You Gain

Outcomes That Move the Needle

Not capabilities. Not deliverables. What actually changes on your project when PKAS is involved.

Status: Secured
schedule

Your Schedule Holds

Primavera P6 baselines engineered with robust logic and float that absorb disruptions before they impact the critical path.

FLOAT: OPTIMAL
Baseline
Critical
✓ LOGIC CHECK: PASS
METHOD: CPM PKAS Verified
FIDIC
gavel

Your Claims Win

Forensic delay analysis, Time Impact Analysis (TIA), and Legally Defensible EOT prolongation dossiers compiled for approval.

✓ 01. Cause-Effect Map
✓ 02. As-Built Linkage
✓ 03. Site Diaries
✓ 04. Time Impact (TIA)
STANDARDS: FIDIC / SCL PKAS Verified
Clash-Free
precision_manufacturing

Zero Clashes

Detailed shop drawings coordinated and pre-approved across architectural, structural, and MEP services before site works.

TOLERANCE: 0.00
STRUC
MEP
ARCH
✓ ALIGNMENT: 100%
BIM_COORD: REV_03 PKAS Verified
Deployment
group_add

Specialists

Bypass recruitment lags. Schedulers, claim analysts, and Quantity Surveyors deployed to your team within 48 hours.

MOBILIZATION: <48H
P6 PLANNER ACTIVE
CLAIM ANALYST ACTIVE
QUANTITY SURVEYOR ACTIVE
✓ INDUCTION: ZERO
POOL: FLEXIBLE PKAS Verified

Seven Disciplines

What PKAS Delivers

All Services arrow_forward
Primavera Scheduling timeline
01 / Planning

Planning, Scheduling, Monitoring & Reporting

Explore arrow_forward
Claims dossiers contracts
02 / Claims

Delay Analysis & EOT Claims

Explore arrow_forward
Quantity surveying calculation
03 / QS

Estimation, QS & QS Supply

Explore arrow_forward
Contract special conditions
04 / Contracts

Tendering & Contract Administration

Explore arrow_forward
MEP utility drawings
05 / Drawings

Engineering & Shop Drawings

Explore arrow_forward
PMC Owner representative
06 / PMC

Project Management Consultancy

Explore arrow_forward
Interior fitout space planning
07 / Design

Interior Design & Space Planning

Explore arrow_forward
Dubai skyline twilights

Why PKAS

The Difference Is in the Detail

What separates a PM consultancy from a PM partner is how they work when the project gets hard.

The Difference in Practice

Without PKAS

  • ✕ Schedule updated reactively, no critical path discipline
  • ✕ EOT claim assembled from emails and memory
  • ✕ Drawing clashes discovered on site, RFIs pile up
  • ✕ QS recruited late, costing delays and premium fees

With PKAS

  • ✓ Live P6 baseline with float analysis and early warning
  • ✓ Contemporaneous records, ready-for-submission narrative
  • ✓ Coordinated drawings approved before site mobilisation
  • ✓ Certified QS on site within days of instruction
Dubai high-rise construction frame at twilight

Ready to Start?

Your Project Deserves a Specialist.
Not a Generalist.

Talk to Arunachalam Rajappa and the PKAS team about your scheduling, claims, or QS requirements. Free initial consultation — no obligation.

Book Your Free Consultation arrow_forward

[ PKAS PMS FZE LLC · DUBAI, UAE · +971 50 228 4155 ]