Forensic delay analysis. Defensible EOT claims.

Time Impact Analysis, impacted-as-planned reconstruction, and prolongation cost quantification — built from contemporaneous site records to the standard adjudicators and arbitrators expect.

Review my live claim arrow_forward

Service Deep-Dive

Delay Analysis & EOT Technical Methodology

We construct legally defensible dossiers under standard FIDIC contract rules. By introducing excusable events directly into Primavera P6 schedules, we calculate precise prolongation overhead costs.

Method 01

Time Impact Analysis

TIA — excusable delay events injected directly into the active Primavera P6 schedule to calculate critical path shift, per SCL Protocol.

Method 02

Windows Analysis

Window analysis — the programme is sliced into discrete time windows and delay attribution is calculated per window against the contemporaneous baseline.

Method 03

As-Built Impact

As-built impact — the as-built programme is reconstructed from contemporaneous records and compared against the as-planned baseline to identify true cause-and-effect.

Method 04

Baseline Impact

Baseline impact — the original baseline is impacted with each excusable event to demonstrate the contractually entitled extension period, independent of as-built outcome.

Why This Matters

The Cost of an Unprepared EOT Claim

70%

EOT claims rejected in UAE adjudication — not due to lack of entitlement but inadequate contemporaneous documentation.

28

Days — the FIDIC Clause 20.1 notice period. Missing it can bar your claim entirely, regardless of merit.

AED 2M+

Typical prolongation claim value on a mid-size Dubai commercial project that PKAS documentation has supported.

What's Included

Every EOT Engagement Covers

✓

Delay Event Register

Contemporaneous log of all excusable and compensable delay events, indexed to contract correspondence.

✓

Impacted Programme Analysis

Delay impacts modelled directly in Primavera P6 — critical path shift calculated per event, not estimated.

✓

Prolongation Cost Statement

Time-related overhead and loss & expense quantified against actual site cost records and preliminaries.

✓

FIDIC-Compliant Narrative

Written claim narrative structured for submission under FIDIC Clause 20 — ready for engineer review or adjudication.