Service 01 · Planning & Scheduling

Primavera P6 baselines built to survive scrutiny.

Logic-driven baseline development, progress monitoring, look-ahead scheduling, and earned-value reporting for Dubai and GCC construction programmes — engineered with float, not for submission.

Discuss your programme arrow_forward

Our Methodology

How PKAS Builds & Maintains Your Programme

A Primavera P6 schedule is only as good as the logic behind it. PKAS builds every baseline from the contract, the scope, and the real constraints of the site — not from a generic template. Activities are sequenced with defensible logic, durations are resource-loaded, and float is tracked to the day.

Baseline Development

Baseline Development

WBS-structured, logic-driven baseline built from contract milestones, scope packages, and site constraints. Every activity has a responsible party and a documented duration basis.

Progress Monitoring

Progress Monitoring

Weekly and bi-weekly updates capturing actual start/finish, remaining duration, and percent complete. Status reports issued to client format with critical path analysis.

Look-Ahead Scheduling

Look-Ahead Scheduling

3-week and 6-week rolling look-ahead schedules produced for site teams — actionable, resource-linked, and tied to the master baseline.

Earned Value Analysis

Earned Value Analysis

Schedule Performance Index (SPI), Cost Performance Index (CPI), and variance reports prepared where client EVM systems require integration.

Why It Matters

The Cost of a Poorly Built Schedule

30%

Average cost overrun on projects where the baseline was built for submission rather than control — never maintained after NTP.

Zero Float

A schedule with no float isn't a tight programme. It's a claim waiting to happen. PKAS baselines are engineered with float and early warning thresholds.

P6 Live

PKAS keeps the programme live throughout construction — not filed after submission. Your schedule is a control tool, not a contract appendix.

What's Included

Every Engagement Covers

✓

WBS & Baseline Programme

Full Work Breakdown Structure, activity coding, and Primavera P6 baseline built to contract requirements.

✓

Monthly/Weekly Progress Reports

Progress updates in client format with critical path narrative, look-ahead, and variance register.

✓

Planner Supply Option

Certified P6 planner supplied on-site within 48 hours of instruction for ongoing programme management.

✓

Schedule Review & Audit

Independent review of existing schedules for logic errors, resource conflicts, and claim exposure.